LA ADU construction reaches record high, accounts for 38% of new housing last year: USC
Los Angeles County’s backyard-housing boom is showing no signs of slowing as accessory dwelling unit construction reached an all-time high last year. The county completed 10,230 ADUs in 2025, more than six times the 1,624 completed in 2018, the Los Angeles Daily News reported, citing a new report from the University of Southern California’s Lusk Center for Real Estate. ADUs made up 37.5 percent of the 27,293 housing units certified for occupancy last year, marking the highest share on record in the near-decade that USC has been tracking ADU production. The surge came even as overall housing production dipped from […]This article originally appeared on The Real Deal. Click here to read the full story.
Categories
Recent Posts

6 Curb Appeal Trends That Can Actually Lower Your Home’s Resale Value

Fear and loathing on eve of election in Los Angeles

ELLE Decoroscope: Your November Design Horoscope Is Here

Bathtub or Walk-In Shower? What Designers Say About Adding Value to Your Bathroom

7 Smart Home Upgrades That Save Money on Energy and Utility Costs

Dana Point landmark Ritz-Carlton, Laguna Niguel resort sells for $600 million

Em-Estudio lines Mexico City bar with walls of books

Bar brawl in downtown Long Beach: Bascom Group vs Dirty Birds

Before & After: How an Artist and Architect Couple Turned the “Worst House” on the Block Into Their Dream Home

Venice single-family homes to give way to multifamily development

"My job is to find and attract mastery-based agents to the office, protect the culture, and make sure everyone is happy! "
26895 Aliso Creek Rd, B-603, Aliso Viejo, California 92656, USA
